In a city where demand for good tradespeople comfortably outstrips supply, it can be tempting to go with the lowest number on the page and worry about the rest later. Resist that. A quote that undercuts everyone else by a third usually means something has been left out — scaffolding, waste removal, making good, VAT, or the extra time needed to work carefully around a listed façade. Renovating a Georgian flat in the New Town or a stone-built villa in Morningside is not the same as a new-build. The right builder for your project is the one who has done this kind of work before, not simply the one who replied first.
Every builder can produce a list of happy customers. The trick is to speak to people whose projects resembled yours: same age of property, similar scale, comparable complications. Ask for three recent references and actually phone them.
A confident, well-organised builder will welcome these questions. Hesitation is an answer in itself.
Before anyone lifts a hammer, ask to see certificates — and check the dates and the figures rather than accepting a photocopy at face value.
A verbal estimate is not a quotation, and a one-line text message is not a contract. Ask for a written quotation that sets out the following clearly:
Never hand over a large deposit upfront. A modest sum to cover initial materials is reasonable; several thousand pounds before a single board is lifted is not. Structure payments against completed stages — demolition and first fix, plastering, second fix, decoration, handover — and pay only for work already done.
Tenement life adds complications that a builder from elsewhere may not anticipate. Common stairs need protecting, neighbours need notice, and anything affecting shared walls, roofs or drainage may require the agreement of other owners or their factor. For structural alterations, extensions or changes to drainage, you will need a building warrant from the local authority before work begins. In the Old Town, New Town and other conservation areas, listed building consent may also be required, and that process takes time.
Outdoors, scaffolding over a public pavement needs a permit, and parking suspensions in controlled zones cost money and take weeks to arrange — worth confirming early, because it affects both the programme and the price. Add in wind-driven rain, short drying windows in winter and the hidden surprises that older Scottish properties love to produce: lath and plaster, damp behind panelling, rot under a bathroom floor.
Budget a contingency of 10 to 15 per cent, keep everything in writing, and choose the builder who answers your questions thoroughly rather than the one who answers fastest. Do that, and your renovation is far more likely to finish on time, on budget and to a standard you will be glad of for decades.
April 25, 2019 at 10:46 am
Take in the iconic skyline and visit the neighbourhood hangouts that you've only ever seen on TV. Take in the iconic skyline and visit the neighbourhood.
Want to be notified when we launch a new template or an udpate. Just sign up and we'll send you a notification by email.
Soldman Kell
April 25, 2019 at 10:46 am
Take in the iconic skyline and visit the neighbourhood hangouts that you've only ever seen on TV. Take in the iconic skyline and visit the neighbourhood.